Unbeknown to any of us, but our beloved pirate ship was in distress. A small hole had appeared in our pirate ship floor so the repair builder was brought in to investigate and the report meant things were looking grim. The damage was much worse than anticipated as a result of mud and sludge from the 2013 Bundaberg Floods being trapped in under the pirate ship floor. The floor structure was completely rotten and was slowly starting to rot the sides of the ship too. So it was Captain Ian and his deckie Danny (from Carwin Homes – the original builders) who put everything back into ship shape order and gave our wonderful pirate ship a fresh new look. So now we are ready to sail again……”Ah Ha Me Hearties”.
BIG THANKS TO THE 2019 PARENT COMMITTEE FOR FUNDING THIS PROJECT AND TO CARWIN HOMES FOR COMPLETING THIS CHALLENGNG TASK AND DOING SUCH A WONDERFUL JOB.
https://www.facebook.com/CarwinHomes/
